Contact Us
86-15910360296
86-10-89718147
Home > Exhibition > Content
High pressure machine installation, commissioning
1, the equipment should be installed in a well-ventilated place, good lighting conditions.
2, installation requires top, water conditions, power supply 220V, power per machine 1.6Kw.
4, adjust the machine balanced, smooth, packaging machine casters to lock position to make it fixed.
5, machine adjustment: switch on the power, press set key on the box for the first time, digital on the blinking of the display, with the ▲ button to adjust and set the desired temperature, factory setting value of 115 degrees. Press set button on the box for the second time, digital on the blinking of the display, with the ▲ button to adjust and set the desired temperature, factory setting value of 50 minutes.
Related Industry Knowledge
- Professional body composition analyzer
- Why do we need body composition ana...
- How to choose the Chinese herbal Bo...
- GS6.5b Inbody BMI Weight Body Fat A...
- 17 Body Composition Parameter Mini ...
- Body Composition Analyzer Fat Analy...
- Medical Product Height Weight Body ...
- Significance of bone mineral density
- Automatic machine for the following...
- Bone density instrument
- PWV conduction principle of pulse wave
- Operation of the automatic boiling ...
- Traditional Chinese medicine decoct...
- Why do we need body composition ana...
- Boiling machine
- Advantages of traditional Chinese m...
- The impact of contemporary Chinese ...
- Automatic Chinese traditional medic...
- The beginning of Chinese medicine